view from roof


This is a view from the top of The 400 building.


Play Yard Remodel News


Tree Removal- The removal was successful, all that is left of the tree is firewood. Here are some images from the process. Click on the image for a bigger picture.


Playground Equipment Removal- Excavation of the play yard was delayed almost 2 weeks because the grass was too soft for the heavy equipment to go up and down. It looks great, and now we are waiting for the people to come and put the playground structure together.


The Re-building begins- The building has begun.


The Home stretch is near- We are down to the last few things that need to be done, wood chips and moving the fence.


Loading the Wood Chips- Loading 100 yards of wood chips to be blown in, yes I said blown in.


All Done- Everything is done. Finally the kids can enjoy the new play yard.


Twin Lakes Church2701 Cabrillo College Drive, Aptos CA 95003831-465-3300